Construction Schedule (Will be updated weekly)

Site Start of Construction Anticipated Lot Reopening Alternative Parking
33 Knightsbridge Lot 1/17/23 Pending Not required at this point
Lot 83 1/17/23 Pending Not required at this point
Busch Lot 58A-58B Phase 1 2/20/23 6/7/23

Lots 51, 62, 65A-D, 67, 67A, 606, 603, 623, 58C, 602

RBHS Piscataway Lot B Phase 1 2/20/23 5/15/23  Gravel Lot (next to Lot B)
Livingston Lot 103 Phase 1 (northern half) 3/06/23 6/08/23 Lot 105
Busch Lot 63 3/13/23 8/11/23 Not required at this point
Busch Lot 67 Phase 1 (east two thirds) 4/10/23 6/23/23 Not required at this point 
Camden Lot C14 5/18/23 9/6/23 Not required at this point 
Livingston Lot 101 5/24/23 8/14/23 Lot 105, Yellow Lot 
Cook Lot 98B 4/11/23 9/18/23 Not required at this point 
Douglass Deck top level 5/17/23 8/15/23  
Cook Lot 98A Phase 1 5/17/23 10/20/23 Lot 97
College Ave Lots 26,27,30 5/22/23 8/15/23 College Ave Parking Deck 
Busch Lots 65/65A/67A 5/15/23 8/25/23 Temporary Allen Hall Lot & Temporary Busch Yellow Lot
Douglass Lot 79 and 79A 5/17/23 8/25/23 Lot 74A
RBHS Piscataway Lot C Phase 2 5/16/23 9/29/23 • Faculty and Staff: Lots 58, 58A, 58B, 58C, lot B and the Gravel Lot
• Students: Lot B and the Gravel Lot
Livingston Lot 103 Phase 2 (southern half) 5/24/23 9/4/23 Lot 105
Busch Lot 55 & 58 Phase 2 6/1/23 10/6/23 Lots 51, 62, 65A-D, 67, 67A, 606, 603, 623, 58C, 602 
Cook Lot 97 7/31/23 10/20/23 Lot 98A
RBHS Piscataway Lot A  9/5/23 11/24/23

Faculty and Staff: Lots 58, 58A, 58B, 58C, Lot B and the Gravel Lot
Students: Lot B and the Gravel Lot